Inspectioneering Journal
Home | Authors Author Indices
A
  • Chris Ablitt, TWI Ltd.
    • Experts Puzzled Over the UK's Largest Storage Tank Terminal Fire - March/April 2006
    • Buncefield Explosion Investigation Progress Reports - May/June 2006
  • Gregory Alvarado, Inspectioneering Journal
    • Keeping Abreast of Industry Changes and Trending for the Future - IJ and API Inspection Industry Benchmarking and Survey Comparisons - March/April 2006
    • Risk-based Inspection - How Healthy is Your RBI Program? - March/April 2007
    • Risk-based Inspection - Utilizing Metrics, Maximizing the Value - Part 2 - May/June 2007
    • Where Do I Set My Risk Threshold? - September/October 2007
    • Risk-based Inspection - The Regulatory Acceptance Process - November/December 2007
    • API 2008 Spring Refining Meeting - API RBI Base Resource Document Meetings Debut - March/April 2008
    • You Don't Get Something for Nothing - Risk-based Inspection - May/June 2008
    • Hess Corporation Fixed Equipment Reliability Coordinator - July/August 2008
    • Learning from the Past: Not Letting "the Pendulum" Swing to the Opposite Extreme in Our Mechanical Integrity Programs - September/October 2008
    • Scalable Accuracy: The Power of Risk Based Inspection and Fitness for Service - March/April 2011
B
  • D. Baham, ConocoPhillips
    • Risk Based Method to Establish Inspection Intervals for Pressure Relief Devices - May/June 2010
  • Bob Baker, John H. Carter Co., Inc.
    • Integrity of Salvaged, Remanufactured and Repaired Control Valves (Part 1) - July/August 2006
    • Integrity of Salvaged, Remanufactured and Repaired Control Valves (Part 2) - September/October 2006
  • Brian Beresford, TechCorr Inspection and Engineering
    • Inspection of Heat Exchanger, Condenser & Fin Fan Coolers Tubes - An Update - May/June 2007
  • Adnan A. Boudi, Ph.D, P.E., AVS., SPE International
    • Results of a Successful Risk Based Inspection Study: Oil Stabilizer Facility - March/April 2011
  • Lyle Breaux, P.E., Stress Engineering Services, Inc.
    • Equipment Vibration Problems - Tools and Techniques Used to Solve Difficult and Unusual Vibration Problems - March/April 2011
C
  • Dan Carnevale, Danatronics Corporation
    • Advances in Hand-held Ultrasonic Thickness Guages with Live Color Waveforms (A-Scan) - January/February 2009
  • Rick Clark, CIA Inspection, Inc.
    • Development of a Remote Robotic Crack Detection System for Internal Inspections of On-line Coke Drums - May/June 2011
D
  • Sanjoy Das, Quality Assurance Division, Bhabha Atomic Research Centre
    • Assessment of Pipe Well Thickness Radiation Technique - July/August 2007
    • Tangential Radiography Technique for Special Weld Joints Configuration - January/February 2008
    • Advanced Digital Radiography Systems and Image Processing Operations in Radiography Inspection - November/December 2010
E
  • F. Egan, Zakum Development Company (ZADCO)
    • Extending the Life of a Corroding Offshore Pipeline - September/October 2006
  • Craig Emslie, Sonomatic Ltd.
    • Advancesments in Integrity Management - Obtaining Greater Value from Thickness Data - July/August 2010
F
  • Charles L. Foster, Pacific Gas & Electric
    • Utilities' High Energy Piping Systems - Utility Industry's Application of Acoustic Emission (AE) Yields Measurable Improvement in Inspection Program Cost and Overall System - November/December 2008
    • Digital Still Cameras Increase Effectiveness of Inspection Documentation - Save on Outage/Turnaround Related Cost - Improve Communication - November/December 2008
G
  • Karen Gibson, Sonomatic Ltd.
    • Advancements in Integrity Management - Obtaining Greater Value from Thickness Data - July/August 2010
  • Richard Green, Accurate Metallurgical Services
    • Fatigue: The Science of Getting Tired - September/October 2008
H
  • A.R. Hamzah, Malaysian Nuclear Agency
    • Developing Methodology of Pulsed Thermal NDT of Materials: Step-by-step Analysis of Reference Samples - May/June 2008
  • P.A. Henry, P.E., Equity Engineering Group, Inc.
    • Risk Based Method to Establish Inspection Intervals for Pressure Relief Devices - May/June 2010
J
  • Paul Jackson, Plant Integrity, Ltd.
    • The New Age of Pipeline Inspection - July/August 2007
  • Arthur Jensen, Sunoco, Inc.
    • AIChE Paper Number 175267 - Ethylene Unit Fire Lessons Learned - Sunoco Marcus Hook, PA Refinery - March/April 2010
K
  • L.C. Kaley, P.E., Equity Engineering Group
    • API RP 581 Risk-Based Inspection Technology Demonstrating the Technology Trhough a Worked Example Problem - January/February 2009
  • Travis Keener, P.E., SGS North America Industrial Services
    • MI Inspection During Capital Projects Promotes PSM Compliance, Corrosion Rate Accuracy and Improved Budgeting - May/June 2011
  • Cliff Knight, P.E., KnightHawk Engineering, Inc.
    • Frequency Response - An Option to Consider for Detecting Complex Structural Defects - July/August 2011
    • Fracture Analysis - September/October 2011
L
  • Santhosh Lukose, Metalcare Inspection Services, Inc.
    • Detection of Corrosion Under Insulation and Blockages on Piping System Using Profiler System - July/August 2010
  • Eric Luther, P.E., Stress Engineering Services, Inc.
    • Equipment Vibration Problems - Tools and Techniques Used to Solve Difficult and Unusual Vibration Problems - March/April 2011
M
  • V.L. Magyari, Equity Engineering Group, Inc.
    • Risk Based Method to Establish Inspection Intervals for Pressure Relief Devices - May/June 2010
  • Paul Marks, NDT Training and Placement Center
    • A Stitch in Time - Selecting NDT Service Vendors - March/April 2006
    • NDT Certification De-mystified - Making Sense Out of Certification for NDT Personnel Per SNT-TC-1A - May/June 2006
  • Scott McNeill, Ph.D., P.E., Stress Engineering Services, Inc.
    • Equipment Vibration Problems - Tools and Techniques Used to Solve Difficult and Unusual Vibration Problems - March/April 2011
  • D. Mukherjee, Quality Assurance Division, Bhabha Atomic Research Centre
    • Advanced Digital Radiography Systems and Image Processing Operations in Radiography Inspection - November/December 2010
P
  • W.J. Perry, GE Inspection Technologies
    • Flange Face Corrosion Inspection, Inspection from the Bolting Surface - July/August 2009
  • Walter Pinto, Lyondell Chemical Company
    • Fixed Equipment Reliability Assuring Excellence (1 of 2) - September/October 2006
    • Fixed Equipment Reliability Assuring Excellence (2 of 2) - November/December 2006
  • Joey Poret, Chevron
    • Increasing Equipment Reliability Through Increased Nondestructive Testing Reliability - May/June 2011
R
  • John T. Reynolds, Pro-Inspect Inc.
    • Ninety-nine "Diseases" of Pressure Equipment - Part 11 - January/February 2006
    • Ninety-nine "Diseases" of Pressure Equipment - Part 12 - March/April 2006
    • The 1995 IJ Survey Results - API Committee on Refining Equipment, Benchmarking, Pressure Equipment and Inspection - March/April 2006
    • Ninety-nine "Diseases" of Pressure Equipment - Part 13 - May/June 2006
    • Ninety-nine "Diseases" of Pressure Equipment - Part 14 - January/February 2007
    • Ninety-nine "Diseases" of Pressure Equipment - Part 15 - March/April 2007
    • Why Some Operating Sites "Just Don't Get It" - May/June 2007
    • What's New with API/ASME In-service Inspection Standard? - September/October 2007
    • Update on the New API/ASME In-service Inspection Joint Code Committee (ISIJC) - November/December 2007
    • How to Prepare for an OSHA NEP Audit - March/April 2008
    • Heat Exchanger Tubular Inspection - A User's Perspective - July/August 2008
    • In-Service Inspection and Repair Codes and Standards - How Do They All Work Together? - November/December 2008
    • A Guide to Using Codes and Standards for Life Cycle Management of Pressure Equipment - March/April 2009
    • How to Put it All Together - A Guide to Organizing a Successful PEI Program - September/October 2009
    • Management Leadership and Support for PEI - January/February 2010
    • Integrity Operating Windows and Management of Change for Pressure Equipment Integrity - March/April 2010
    • The Role of Corrosion Control in Achieving Excellence in Pressure Equipment Integrity and Reliability - May/June 2010
    • The Role of Risk Assessment and Inspection Planning in Achieving Excellence in Pressure Equipment Integrity and Reliability - September/October 2010
    • Avoiding HTHA Failures in Existing Equipment - November/December 2010
    • The Role of Life Cycle Management in Achieving Excellence in Pressure Equipment Integrity and Reliability - January/February 2011
    • The Role of Industry Codes and Standards in Achieving Excellence in Pressure Equipment Integrity and Reliability - July/August 2011
    • New and Revised API Inspection Standards in Progress - September/October 2011
  • Richard D. Roberts, Quest Integrity Group, LLC
    • Recent Technological Advances in Ultrasonic-Based Intelligent Pig Technology for Fired Heater Coils - January/February 2010
  • Clay Rodery, BP
    • Update on the New API/ASME In-Service Inspection Joint Code Comittee (ISIJC) - November/December 2007
S
  • Paul Schubert, Ph.D., SGS North America Industrial Services
    • MI Inspection During Capital Projects Promotes PSM Compliance, Corrosion Rate Accuracy and Improved Budgeting - May/June 2011
  • B.K. Shah, Quality Assurance Division, Bhabha Atomic Research Centre
    • Assessment of Pipe Well Thickness Radiation Technique - July/August 2007
    • Tangential Radiography Technique for Special Weld Joints Configuration - January/February 2008
    • Advanced Digital Radiography Systems and Image Processing Operations in Radiography Inspection - November/December 2010
  • Barry Snider, Small Hammer Incorporated
    • The Fourth Maintenance Revolution - September/October 2011
  • Julian Speck, TWI Ltd.
    • Experts Puzzled Over the UK's Largest Storage Tank Terminal Fire - March/April 2006
    • Buncefield Explosion Investigation Progress Reports - May/June 2006
    • Opening of NDT Validation Centre - May/June 2006
U
  • Del Underwood
    • Bolt Behavior No. 1 - January/February 2011
    • Bolt Behavior No. 2 - March/April 2011
    • Bolt Behavior No. 3 - May/June 2011
V
  • Dr. Pieter VanderWerf, Building Works, Inc.
    • Concrete Corrosion - Problems and Cures - September/October 2011
  • Leo Vega, Stress Engineering Services, Inc.
    • Field Metallurgical Replication - January/February 2011
W
  • W. David Wang, Shell Global Solutions
    • Heat Exchanger Tubular Inspection - A User's Perspective - July/August 2008