Regular columns:
Ø
Every “IJ” contains
the “IJ” Activities Planner, a
world-wide listing of upcoming events of interest to the InspectioneerTM. Helpful keys are provided to alert the
reader to intended to topics, e.g. FFS (fitness for service), NDE
(nondestructive evaluation), RI (regulatory issues), RBI (risk based
inspection), etc. Digital subscribers
have a choice to visit hosts’ sites or send e-mails where links are
provided. This will start in 1998.
Ø
Letters to the Editor,
A place to pose questions, voice critiques and offer solutions to the editors
and readership.
·
JANUARY / FEBRUARY
2005
By: Julian Speck
Structural Integrity Department Manager
Bridget
Hayes, P.E.
Principal
Engineer
TWI
Magnetostrictive
Sensor Technology – How It’s Grown in the Last 10 Years
By: Bob Stakenborghs PE
Engineering Manager
Evisive Inc.
·
March / April 2005
By: John T. Reynolds,
Shell Global Solutions (US), Inc.
By: Afshin Motarjemi
Sr. Integrity Engineer
Julian Speck
Structural Integrity Department Manager
TWI
The
Inspectioneering Journal Marks 10 Year Anniversary
By:
Greg Alvarado,
Chief Editor and Publisher
Inspectioneering Journal
PVRC Workshop
– Best Practices For Flange Maintenance and Assembly
Engineering Manager
Evisive, Inc.
Industries
Activity Planner
· May / June 2005
Shell Global Solutions, Inc.
34th
Turbomachinery Symposium
Avoiding PWHT
– Can It Be Justified?
Engineering Manager
Industry
Activities Planner
·
July / August 2005
Developments
in Integrity Management with TOFD Inspection
By: Bryan Kenzie
Principal NDT
Engineer
Julian
Speck,
TWI
Stress
Corrosion Cracking in SA304 Stainless Steel Phenolic Resin Reactors
By: Mark F Bagnell
Equipment
Management & Inspection
Uncertainty in
Flaw Sizing by Radiography Method – A Primer Plus
By: Sanjoy Das
B.K. Shah
Atomic Fuels
Division,
Bhabba Atomic
Research Centre,
Survey in
September / October 2005 Issue
Damage
Mechanisms Affecting Fixed Equipment in the Fossil Electric Power Industry in
the Fossil Electric Power Industry
By: Jonathan D Dobis
P.E.
Principal
Engineer
David N.
French
National
Pressure Equipment Conference
API
Endorsement Programs Update
By: Kelly J Smith
Fixed
Equipment and Inspection Lead
Refining
Technical Services
ConocoPhillips
Avoiding PWHT
– Can it be Justified?
Question to
the Author
Kuwait First International Petrochemicals
Conference and Exhibition
Combining NDE and
Engineering Analysis
In Stream
Reformers – Part 1
By: Richard D Roberts
Quest TruTec, LP
John Brightling
Johnson Matthey Catalyst
PVRC
Conference in Houston, TX
Industries
Activity Planner
· September
/ October 2005
By: John T. Reynolds, Shell Global (US), Inc.
Inspectioneering
Plant Pressure Equipment-
2005 Inspection
and Reliability Survey
By: Greg Alvarado,
IJ Chief Editor and Puplisher
Is Calibration of NDT
Equipment Necessary?
By: Mohd Zaki B Umar, Abd
Nassir B Ibrahim, Dr, AB
Razak B Hamzah
Malaysian Institute for Nuclear Technology Research (MINT)
· November
/ December 2005
By:
Ian Partridge
Principal Pressure Vessel Engineer
John Wintle
Structural Integrity Consultant
Vice-Chairman of the Institute of
Mechanical Engineers
Julian Speck
TWI Ltd.
By:
John T. Reynolds,
Combining NDE and Engineering Analysisto Optimize Tube Life in Stream Reformers – PART 2
By: Richard D.
Roberts
Quest TruTec,
LP
John
Brightling