InspectioneeringTM Journal
·
2001 Index Summary
The
following copyright protected listing of past articles and summaries is
provided as a value-added service/reference for subscribers to the InspectioneeringTM Journal (“IJ”).
Regular columns:
Ø
Every “IJ” contains
the “IJ” Activities Planner, a
world-wide listing of upcoming events of interest to the InspectioneerTM. Helpful keys are provided to alert the
reader to intended to topics, e.g. FFS (fitness for service), NDE
(nondestructive evaluation), RI (regulatory issues), RBI (risk based
inspection), etc. Digital subscribers
have a choice to visit hosts’ sites or send e-mails where links are
provided. This will start in 1998.
Ø
Letters to the Editor,
A place to pose questions, voice critiques and offer solutions to the editors
and readership.
·
January / February 2001
·
March / April 2001
101 Essential Elements in a Pressure Equipment Integrity
Management Program for the Hydrocarbon Process Industry –Part 6
By; John T. Reynolds, Shell Global
Solutions / Equilon Technology
Westhollow Technical Center Houston,
Texas
Interaction
of RBI and FFS Technologies
By: Gerrit M. Buchheim, M&M Engineering, Shaker Heights,
OH
The Importance of Choosing the right Inspection Plug
System- Equipment Under Insulation
By: Deal Moore, NDE Seals Inc.,
Houston, TX
· May / June 2001
Engineering Critical Assessment of a Service-Damaged Pressure Vessel
Under Sour Service Conditions
by Dr. John Bowker and Mr. Russell Orr
Follow-Up: Status of the Texas PE Board Initiative on “Guidelines
for Minimum Laboratory and Staff Qualifications for Nondestructive Testing
Services”
By:
Russel T. Mack, PE ASNT L-III
Chairman
of the Board, NAIC (National Association of Inspection Companies)
101 Essential Elements in a Pressure Equipment Integrity
Management Program for the Hydrocarbon Process Industry –Part 7
By; John T. Reynolds, Shell Global
Solutions / Equilon Technology
Westhollow
Technical Center Houston, Texas
Risk Based Inspection (RBI) Applied to Power Boilers-Successful Case in
Brunei
Industry
Activities Planner
·
July / August 2001
by Greg Alvarado, IJ Chief Editor
Perf, emats, lamb waves, aut
101 Essential Elements in a Pressure Equipment Integrity
Management Program for the Hydrocarbon Process Industry –Part 8
By; John T. Reynolds, Shell Global
Solutions / Equilon Technology
Westhollow
Technical Center Houston, Texas
A Sad Farewell to Nick Rosencran – Inspectioneering Community
Loses a Friend and Co-worker
· September
/ October 2001
By:
Russel T. Mack, PE ASNT L-III
Chairman
of the Board, NAIC (National Association of Inspection Companies)
National
Association of Inspection Companies (NAIC)
101 Essiential
Elements in a Pressure Equipment Intergrity Management Program – Part 3
Westhollow
Technical Center, Houston, TX
Evaluation,
Reporting and Training of Ultrasonic Thickness Data From Recovery Boiler
Inspections- Part 2
Industry
Activities Planner
· November
/ December 2001
By: Paul Marks,
IRIS
Inspection Services, Inc.
Houston,
TX
Westhollow
Technical Center, Houston, TX
By: Chia-Pin Hsiao,
Chevron
Research and Technology
Richmond,
CA
Industry
Activities Planner