InspectioneeringTM Journal
· 2008 Index
Summary
The
following copyright protected listing of past articles and summaries is
provided as a value-added service/reference for subscribers to the InspectioneeringTM Journal (“IJ”).
Regular columns:
Ř
Every “IJ” contains
the “IJ” Activities Planner, a
world-wide listing of upcoming events of interest to the InspectioneerTM. Helpful keys are provided to alert the
reader to intended to topics, e.g. FFS (fitness for service), NDE
(nondestructive evaluation), RI (regulatory issues), RBI (risk based
inspection), etc. Digital subscribers
have a choice to visit hosts’ sites or send e-mails where links are
provided. This will start in 1998.
Ř
Letters to the Editor,
A place to pose questions, voice critiques and offer solutions to the editors
and readership.
· JANUARY
/ FEBRUARY 2008
Key
word: Tangential radiography, End plug to tube welds, Pipe radiography
Important
Update: Fixed Equipment Reliability Survey Results from 32 Refineries, 11 Gas
Plants, 10 Petrochemical Plants
Key
words: Inspection, materials, mechanical, metallurgical, corrosion,
engineering, NDE, ultrasonics, acoustic emission, emats, ACFM, eddy current,
RFEC, RBI, reliability, refinery, petrochemical, inspection database management
programs, radiography, digital, regulator, fitness for service, remaining life,
long range UT, pressure vessel, piping, tanks, heat exchanger, MOC
“IJ” 2006
Survey Tally
API 2008
Pipeline Conference and Cybernetics Symposium
·
March / April 2008
Principal Consultant Pressure equipment
Integrity Pro-Inspect, Inc
Key
words: API 521, API 576, API 510, pressure vessels, piping, relief systems
API 2008
Spring Refining Meeting – API RBI Base Resource Document Meetings Debut
Editor
by Greg Alvarado, “IJ” Chief Editor
TechCorr Inspection and Engineering,
LLC
Houston, TX
35th
Annual Review of Progress in Quantitative Nondestructive Evaluation (QNDE),
University of Illinois - Chicago
·
May / June 2008
Alberta
Boiler Safety Association Issue Rev 5 Inspection & Servicing Requirements
for Pressure Equipment
European
Commission Launches Study on the Competitiveness of the European Pressure
Equipment Sector
Developing
Methodology of Pulsed Thermal NDT of Materials: Step-by-step Analysis of Reference Samples
You Don’t Get
Something for Nothing Risk-Based Inspection
·
July / August 2008
Kuwait
Pipeline Conference and Exhibition
API RBI
European Workshop
Eurojoin 7
Seventh European Congress on Joining Technology
Heat Exchanger
Tubular Inspection - A User’s Perspective
By: John T. Reynolds
(retired)
W. David Wang
Shell Global
Solutions, Inc
Cape 2009
First Announcement and Call for Papers 9th International Colloquium on Aging
Materials for this Assessment and Extension of Equipment Lifetime
United States
CSB Determines massive propane Fire at Valero Refinery in sunray, Texas,
Resulted from Water Freezing and Cracking idle Section of Process Piping
Interview with
Scot Haines
Hess
Corporation Fixed Equipment Reliability Coordinator
By: Gregory C. Alvarado
“IJ” Chief
Editor
2009 NPRA
Reliability & Maintenance Conference
European
Committee of User Inspectorates (ECUI)
· September
/ October 2008
Static Spark
Set Off Fire and Explosions at Solvents Facility Investigation Finds Equipment
not intended for Flammable Service or Properly Bonded and Grounded
Learning From
the Past Not Letting “the Pendulum” Swing to the Opposite Extreme in Our
Mechanical Integrity Programs
Accurate Metallurgical Services
Hurricane
Response – The Latest API Information
· November
/ December 2008
Greg Alvarado, “IJ” chief Editor
Utilities’
High Energy piping Systems – Utility Industry’s Application of Acoustic
Emission (AE) Yields Measurable Improvement in Inspection Program Cost and
Overall System
Integrity
By: Charles L Foster
Digital
Still Cameras Increase Effectiveness of Inspection Documentation – Save on
Outage/Turnaround Related Cost – Improve Communication
“IJ” Editor
Pacific Gas & Electric
In-Service
Inspection and repair Codes and /standards – How Do They All Work Together?
Pressure Equipment Integrity Consultant
Pro-Inspect, Inc
“Sustainable
Energy for the Third millennium”
Learning From
the Past
Not Letting “the
Pendulum” Swing to the Opposite Extreme in Our Mechanical Integrity Programs –
Part 2
Editorial by Greg
Alvarado “IJ” Chief Editor
Statement for
the BP Independent Safety Review Panel
Highlights of
the 4th International workshop on Risk-Based Engineering Held in
Tokyo
Local Houston
Group Makes Strides to Solve Industries Inspection Professional Shortage